Please confirm that the budget for the Using Agency’s purchase of the FFE as described in the Project Manual is not included in the $195,000,000 funds available for the project as listed on the revised Design-Build Pricing Schedule. As to construction air quality, and safety protocols, those are Means and Methods that are not covered within the Bridging Drawings and Narratives. Those expectations are clarified in the RFP and the CDB’s standard documents for Design-Build referenced therein. Other references in the RFP include but are not limited to CDB document standards and current versions of the CDB Design and Construction Manuals available in the CDB’s online resource and reference libraries. In response to the RFI question on the scope of soil remediation, including haul off and certified disposal, the remediation scope shall be determined by the Offeror as explained above.
There appears to be a conflict in the floor plan of the LTC building in both the structural and architectural plans when overlaying the 1st floor with the basement floor for the 2 north wings. Basement floor plan/footprint appears to be larger than the 1st floor. If this is intentional it would seem to require more documentation to indicate green roof, etc. If unintentional, please provide updated design documentation to clarify the scope requirements. YP - The Real Yellow PagesSM - helps you find the right local businesses to meet your specific needs. Search results are sorted by a combination of factors to give you a set of choices in response to your search criteria.
Expert Career Advice
This is because the Phase II ESA provided with the Bridging Document was limited in its scope of location of borings and sampling based on the concept Bridging level site plans. The Offerors shall coordinate efforts around their final proposed site plans. In addition, current and past asbestos management plans and survey reports, recently updated supplemental sampling reports for multiple buildings, have been made available for reference by the CDB to Offerors on the FTP site. Please inform the CDB if you do not have access to these documents. The Division 21 narrative, in the "SITE AND BUILDING FIRE PROTECTION WORK" section, released as part of Amendment #3, lists all areas included in the fire protection scope of work.
“Preferred” listings, or those with featured website buttons, indicate YP advertisers who directly provide information about their businesses to help consumers make more informed buying decisions. YP advertisers receive higher placement in the default ordering of search results and may appear in sponsored listings on the top, side, or bottom of the search results page. The Illinois Veterans' Home at Quincy is responsible for providing economical and quality long-term care for veterans and their spouses which includes domiciliary care, intermediate care, and skilled care. These services are provided by a multi-disciplinary group of health care professionals as well as an array of supportive staff. These services are directed to provide multiple physical services as well as restorative services to maintain maximum functioning capacity. The scope of soil remediation shall be the responsibility of the Offeror, along with the delineation of the impacted soil within the limits of the project .
Military Affairs Department
Use of temporary O2 tanks would be acceptable to serve buildings where needed during construction until point when final O2 installation is complete. This narrative includes requirements and options and flexibility. Please clarify tunnel demo requirement and proposed route of replacement tunnel. The CDB has shared scans of available drawings of existing buildings with the Offerors. Please provide a responsibility matrix for Furniture Budgets provided with the Project Manual - Volume 1 to confirm who is responsible for the purchase and install of the interior and exterior furniture.
Save time with an easy-to-understand breakdown of services and fees. Drawing S-C-104 shows a new proposed sanitary sewer to be constructed on the East side of existing Building 94 and Building 31 . No additional environmental information will be provided other than the above. Medical Air and Vacuum are provided by stand alone units in these building and demolition of buildings should not affect them. Of oxygen as needed to maintain service to occupied buildings.
Veteran's Employment
With the information available, the delineation of the impacted soil within the limits of the project shall be the responsibility of the Offeror. The reasoning for this response is the same as stated in the previous paragraph. Therefore, it was decided to not duplicate spaces, which would lead to under-utilization.
Volume 4 of the Phase II proposal affords the Offerors an opportunity to explain any proposed deviations and betterments that have been included as part of the base price proposed. For pricing proposal are we including the landfill fee ton rate to dispose of existing asphalt, concrete pavement, concrete and brick? Please clarify scope expectations for base proposal for camera inspection of existing on-site storm and/or sanitary sewer systems. Please confirm the correct design and construction goals for the project. "The new residential building construction type shall be R-2, Type IIA and will be design per Risk Category IV. "State buildings which are administrative, residential, , or institutional facilities (K-12 schools, prisons, mental health centers) shall be considered essential facilities for assignment of importance factors.
The reasoning is that the Phase II ESA was limited in scope and provides an assessment of the absence or presence of contamination above IEPA TACO Tier 1 Site Remediation Objectives. The location of borings and sampling was based on the concept site plans for the proposed redevelopment. The Offeror shall be required to perform the supplemental soil investigation to delineate the impacted soil to be excavated and disposed in order to construct the facility improvements.
The Domiciliary on this State Veterans Home campus is intended to be a general purpose Domiciliary, and not a specialized mental health treatment facility found on other federal VA run campuses. It is intended that feedback and confirmation of this approach will be gained at the 35% review submission made to the USDVA. This response clarifies that while the Offeror shall be responsible for the design and coordination of furniture and FF&E items, the final PO for furniture shall be placed by the State of Illinois' purchasing arm, coordinated via the CDB. An amendment is not required to formalize this clarification because such has been stated in the paragraph titled "Design and Installation Responsibility Assignments" on page 4 & 5 of the Concept FF&E Narrative in the Bridging Documents. This information has not changed since the original RFP as an understanding of this responsibility is an important part of the offerer's proposal, we encourage any further questions in the form of an RFI.
Sheet SM101 does not appear to require demo of the existing “North Tunnel” that runs generally west of the Kent Building , but if not demolished it will conflict with the proposed LTC building. Please advise if these program areas are required and how they should be addressed in the Bridging documents for pricing. According to the VA Space Planning Criteria Chapter 312 Domiciliary , there appears to be some required program space missing for the Domiciliary building. CDB has distributed drawings, for reference only, to the Offerors shortlisted to participate in Phase II. These are compilations of available information and may not be comprehensive. It was not the intent of the Bridging Documents to apply the VA Barrier Free Standard to all aspects of this State VA nursing residence. The USDVA has shared that a State VA homes have a certain amount of flexibility in interpreting standards to their needs and shall have to meet the minimum standards established by the State’s Jurisdictional Authorities.
If more than one firm is utilized then additional entries should be included for each firm on the team. Sorry to bother you but was hoping to see if there is any opportunity to utilize fiber reinforced concrete in lieu of welded wire and/or rebar on your Veterans Home Nursing Home/Domiciliary project in Quincy. For your information, please find attached a conversion guide that shows conversion from traditioanal reinforcement to our macro FiberForce 750.
The successful firm will be required to complete these at the time the contract is being executed. The ability of the Home to provide the care and services required by the veteran's medical diagnoses and assessed needs. Peacetime veterans with one year of honorable military service may also be eligible for admission; other qualifying conditions, as required, must be met. I believe that comments were made during the November 19, 2019 Pre-submittal Meeting that it was understood that the project will have not been designed and/or bid at the time of submission and that the subcontractor list would not be known. Please confirm our understanding in regards to the MBE/WBE/VBE requirements for the RFP response. Pleasedo not include any cost information in any of the narratives.